As it is essential to be completely familiar with design drawings and specifications, work through the following list before commencing pipe installation:
1. Check that the correct pipes and fittings are stored at the correct locations. 2. Combine and match couplings and rubber rings by diameter and match with the location of the stored pipes. 3. Confirm the locations and types of all thrust resisting bracing. 4. Confirm all testing requirements and whether testing will be done in sections or for the completed system. 5. Draw up a realistic but firm construction schedule.
|