James Hardie
 
  About Us
Contact Us
Site Map
FAQs
Preparation
 

As it is essential to be completely familiar with design drawings and specifications, work through the following list before commencing pipe installation:

1.  Check that the correct pipes and fittings are stored at the correct locations.
2.  Combine and match couplings and rubber rings by diameter and match with the location of the stored pipes.
3.  Confirm the locations and types of all thrust resisting bracing.
4.  Confirm all testing requirements and whether testing will be  done in sections or for the completed system.
5.  Draw up a realistic but firm construction schedule.

 

 

 

 


For more information please contact James Hardie Customer Service
by phone on FreeCall 1800 659 850, 7.30am-5.30pm (EST),
Monday to Friday or email  frcpipes@jameshardie.com.au
 


 

   Sorry, there are no files associated with this page or being inherited by this page

 

These documents are in a PDF format. If you do not have Adobe Acrobat for viewing PDF files, please click on the link below.